Openings

  • Doorways and doors:
  • Many doors have been removed from the interior of Building 29, likely during the asbestos abatement or removal of scientific equipment in 2014. Construction drawing specifications called for hollow metal doors in most rooms, and some of these do remain in place. The lobby and vestibule doors on the first floor are aluminum-framed fully-glazed doors.
  • Windows:Windows are one-over-one, double-hung-sash, polished aluminum frame units.

...