Building 29A

  • Building 29A, NIH Division of Biologics Standards Laboratory Annex, is nationally significant for its association with the history of medicine and public health because within the laboratories of Building 29A, scientific investigators conquered some of the deadliest infectious diseases that scourged America and the world. Some of the most well-known scientists and administrators of the twentieth century worked in this building, first for the NIH and then for the Food and Drug Administration (FDA).
  • Building 29A was designed to be an Annex for the Division of Biologics Standards Laboratory and was built from 1965 to 1967. The building does not contain the Georgian Revival style features that are present on the historic core of the NIH campus. Compared to construction drawings, the floor plan of Building 29A has not changed much since it opened in 1967. When the building was vacated in 2014, most of the laboratory equipment was removed, but some interior spaces do still convey the significance of the laboratory function.
  • Building 29A was always intended as an annex of additional space for Building 29, and the two functioned as a complex for biologics research and regulation. Much like Building 29, Building 29A is lacking in architectural ornament and focuses instead on the functionality and utility of the space. This was common for government and institutional buildings in the early 1960s and reflected the tight budgets and timelines for construction. Building 29A differs from Building 29 in terms of floor plan and in the large amount of glazing on the exterior. Building 29A retains its physical integrity and still conveys its 1960s modern design plan and the laboratory functions for which it is known.
  • Architect/Engineer: Smith Hinchman & Grylls Associates (Detroit, MI)
  • Builder, contractor, suppliers: Public Building Services of the General Services Administration (GSA) administered the contracts, under the direction of Bernard L. Boutin. George Hyman Construction Co. served as the general contractor. W.G. Cornell Co. was the mechanical subcontractor, with E.C. Ernst, Inc. serving as the electrical subcontractor.

Photo Credit: Rob Tucher Photography


  • Building 29A had a different floor plan and design from Building 29 and most other lab buildings at NIH.
  • Instead of a central corridor, there was an exterior corridor around the entire perimeter of the building and then two smaller cross corridors (Neuberg 2014).
  • Labs faced the interior of the building and were shielded from light, heat, and noise from outdoors.
  • A utility core behind each hallway allowed for this configuration and brought electric, plumbing, gas, etc. to the labs.
  • Air intake towers, located in the median of the parking area in front of the building, provided clean air for the mechanical system, while a high velocity exhaust air system was placed on the roof to ensure dilution and dispersion of laboratory and vivarium exhaust air.

Drawing Credit: NIH Office of Research Facilities 1964.


Utility Corridors circled in Red on Excerpt of Building 29A 2nd Floor Plan. Drawing Credit: NIH Office of Research Facilities 1964c.

Bibliography:

Neuberg, Phillip W. Maryland Inventory of Historic Places (MIHP) Form M:35-9-18.

On file at Maryland Historical Trust, Crownsville, MD, 2014.


NIH Office of Research Facilities. Architectural Drawing 2.1, Site Plan – Civil, for

Building 29A. On file at the Chief Engineer’s Office, Office of Research Facilities, Bethesda, MD, 1964.


NIH Office of Research Facilities. Architectural Drawing 3.2, First Floor Plan, for

Building 29A. On file at the Chief Engineer’s Office, Office of Research Facilities, Bethesda, MD, 1964.


NIH Office of Research Facilities. Architectural Drawing 3.3, Second Floor Plan, for

Building 29A. On file at the Chief Engineer’s Office, Office of Research Facilities, Bethesda, MD, 1964.