When the Division of Biologics Standards (DBS) was established in 1955, this it centralized the biologics regulatory function at the National Institutes of Health (NIH) was centralized into one division, rather than spread across having staff in multiple laboratories and institutes; however, for the first five years, the staff was still spread amongst among multiple buildings on the NIH campus. In 1960, Building 29 was completed, and the staff was consolidated into one space. During the early 1960s, the laboratories and the sections within them were still being finalized and organized based on the growing needs scientific knowledge and the demands of vaccine production and other biologics regulations. By 1968, the DBS had established the below seven laboratories described below.

When the DBS was administratively transferred to the Food and Drug Administration (FDA) Bureau of Biologics in 1972, many of these labs remained the same, but under the title of Division instead of Laboratory. During the 1980s there was significant reorganization, and many divisions were combined, abandoned, or changed names laboratories changed names, combined with other laboratories, or were closed entirely. 

...

Table of Contents
maxLevel3
minLevel2

...

Dive
preface
classgrid-row grid-gap
Dive
classgrid-col-12

black and white photo of Building 29 from the front

Span
classcaption

Front (north) Elevation of Building 29.

Span
classcredit

Rob Tucher Photography

The locations of the laboratories, if looking at the front elevation of Building 29 (shown above):

Laboratory of Bacterial Products

  • 4th Floor (Rooms 420, 429, 431, 429A, 432, 418, 406, 416); left side of 4th floor (if looking at the front elevation of Building 29) floor  

Laboratory of Biophysics and Biochemistry

  • Rooms 305 and 306; right side of 3rd floor (if looking at the front elevation of Building 29)floor 

Laboratory of Blood and Blood Products

  • 1st floor (from 1960 to 1967) (Rooms 112, 107, 114, 111, 104, 100, 404, 400) and then the 2nd and 3rd floors (after 1967) (Rooms 318, 324, 326, 311, 225, 330, 219, 306); right side of 1st floor, then left side of 2nd and third floors (if looking at the front elevation of Building 29) floors 

Laboratory of Control Activities

  • 4th floor (from 1960 to 1967) (Rooms 400, 405, 416, 401, 402, 403); right side of 4th floor (if looking at the front elevation of Building 29)  floor   

Laboratory of Pathology

  • Rooms 512 and 516; middle left side of 5th floor (if looking at the front elevation of Building 29) floor 

Laboratory of Viral Immunology

  • 2nd floor (from 1960 to 1967) (Rooms 212A, 229, 200, 208, 209, 230, 221, 311); most of 2nd floor (if looking at the front elevation of Building 29) floor  

Laboratory of Virology and Rickettsiology

  • 2nd and 3rd floors (from 1960 to 1967) (Rooms 318, 308, 332, 207, 216, 316, 330, 222, 214, 207); most of 3rd floor (if looking at the front elevation of Building 29) floor 

Organizational Changes in CBER

...