Air intake towers, located in the median of the parking area in front of the building, provided clean air for the mechanical system, while a high velocity exhaust air system was placed on the roof to ensure dilution and dispersion of laboratory and vivarium exhaust air.
Drawing Credit:
Span | ||
---|---|---|
| ||
NIH Office of Research Facilities 1964 |
...
Building 29B
Building 29B was constructed from 1993 to 1994 as additional space for the FDA Center for Biologics Evaluation and Research (CBER). It is connected to Building 29A by pedestrian bridges at three levels and at the basement level.
...